With the addition of the cafeteria walls and the roof, the building has taken full shape. Most of the drywall is complete in the office and some classrooms have painted walls. The large media center window is currently being framed to prep for glass. The gym is ready for concrete this week and the cafeteria floor will be close behind. Sams Well Drilling began the first of seventy wells last week for the Geothermal field. Each well in the loop will be about 300 feet deep. Take a look at the pictures and check out the You Tube link for the most recent video highlights.
No comments:
Post a Comment