Wall tile continues in the second floor bathrooms this week. The framing for the drop ceiling is being installed by a worker wearing stilts. The main library window is complete and framing is being installed on the north media center window. The learning center has half walls completed. Tables will be placed on each side to allow space for small groups to collaborate and use technology for research and preparing reports and presentations. Check out youtube.com/user/oaklawnoasd for walk through videos.