This week at Oaklawn the cafeteria structure and roof are in place, the brick work is going around the gym and exterior windows are mostly installed. The interior steps have concrete and are functional. Drywall continues to be installed in the office and throughout the building. Drilling for the Geothermal wells will begin soon. The south side fence playground fence will be moved north six yards onto the blacktop to create the space for the first series of wells. Footage in the YouTube video shows the area where the drilling will begin. Classroom and office loose furniture bids are being finalized and the library furniture is set.